13 pcs - H8 Phillips Round Head Bolt
13 pcs - H9 Lock Nut
13 pcs - P11 Red Player
STEP 5:
Slide P13 3 Player Rods, P14 5 Player Rod and
P15 2 Player Rod through C1 Rod Bushings of
one P1 Side Apron as shown in FIGURE 5.
IMPORTANT NOTE: Please note the location
of the hole that is near one end of each rod.
This is the handle end of the rod.
Place one P17 Rod Bumper and one P16 Rod
Washer on each rod as shown in FIGURE 5.
Place P11 Red Players on each rod as shown
in FIGURE 5.
IMPORTANT NOTE: The goalie should be
at your left and your team (player face)
facing to the right.
Looking ahead to Page 9 FIGURE 9 - will
help you with correct player and rod handle
assembly onto rods.
Place one P16 Rod Washer and one P17 Rod
Bumper on each rod as shown in FIGURE 5.
= P11 Red Player
= P16 Rod Washer
= P17 Rod Bumper
STEP 6:
Align P11 Red Player to each player hole and attach
using H8 Bolts with H9 Lock Nut as shown in
FIGURE 6 and DETAIL A.
Attach P18 Rod End Caps to the rod as shown in
FIGURE 6.
Slide P19 Rod Handle onto each rod end with the
small hole shown in FIGURE 6.
IMPORTANT NOTE:
A small amount of liquid soap applied inside each
P19 Rod Handle will allow them to slip onto rod easier.
DETAIL A
Soccerman
facing up
H9
All Rights Reserved.
© 2012 Escalade Sports
C1 Rod Bushing
Note: C1 Rod Bushings
are already attached
onto each P1 Side Apron
H8
P11
Rod
PARTS REQUIRED:
2 pcs - P13 3 Player Rod
1 pc - P14 5 Player Rod
1 pc - P15 2 Player Rod
LOOKING DOWN ONTO TABLE
P13
3 Player Rod
Hole / Handle End
LEFT
P18
LOOKING DOWN ONTO TABLE
Rod End Cap
Note:
Small Hole
P19
Rod Handle
7
8 pcs - P16 Plastic Rod Washer
8 pcs - P17 Rod Bumper
4 pcs - P18 Rod End Cap
4 pcs - P19 Rod Handle
OVERHEAD VIEW
P14
P15
5 Player Rod
2 Player Rod
OVERHEAD VIEW
P18
Rod End Cap
P19
Rod Handle
For Customer Service Call 1-888-996-2729
P17
P16
P11
P16
P17
P13
P1
3 Player Rod
Side Apron
FIGURE 5
RIGHT
FIGURE 6