Kohler K-3597 Guia Del Usuario página 4

Ocultar thumbs Ver también para K-3597:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Theory of Operation (cont.)
After flushing, a charge cycle takes place. Supply line water flows into
the vessel through the screen and pressure regulator. The water then
flows across the air inducer, which mixes a small amount of air with
the water, filling the vessel until a pressure of approximately 35 psi
(2.5 Kg/cm squared) is reached. The toilet will be ready for the next
flush within 60 to 90 seconds. If the toilet is not ready for the next
flush within that time, please refer to the Troubleshooting section.
1086530-5-B
4
Kohler Co.

Publicidad

Tabla de contenido
loading

Tabla de contenido