1-04-2006
11:36
Pagina 33
ALLATION AND PRELIMINARY OPERATIONS
Following these operations, connect the plum-
ss that the machine and
bing systems as illustrated in the following figu-
e complete, then proceed
re.
so that it is level on a flat
porting feet by inserting
Avoid throttling in the connecting tubes.
cylindrical unit;
ot into the screw thread
Assess that the drain pipe (3) is able to eli-
minate waste.
assembled unit into the
the machine's adjustable
by regulating the adjusta-
es have to face upwards,
e following illustration.
KEY
1 Softener
2 Mesh filter
3 Drain Ø 50 mm
NOTE: For a correct functioning of the machi-
Fig. 11
ll a softener (1) and then
the external part of the
ng preliminaries and after
ike sand, particles of cal-
damage the delicate gra-
ability will be guaranteed.
The machine must always be protected by
an automatic omnipolar switch of suitable
All manuals and user guides at all-guides.com
WARNING
1
ne the water works pressure must not
exceed 4 bars.
Otherwise install a pressure reducer
upstream of the softener; the internal
diameter of water entrance tube must
³⁄₈ "
not be less than 6mm (
).
CAUTION
RISK OF SHORT CIRCUITS
power with contact openings of equal dis-
tance or more than 3mm.
Nuova Simonelli is not liable for any dama-
ge to people or objects due to not observing
current security measures.
Prior to connecting the machine to the electrical
mains, assess that the voltage shown on the
machine's data plate corresponds with that of
the mains.
If it does not, carry out the connections on the
2
basis of the available electrical line, as follows:
• for V 380 / 3 phases voltage +Neutral:
3
Fig. 12
• for V 230 / monophase voltage
KEY
1 Black
2 Grey
3 Brown
Fig. 13
Fig. 14
4 Blue
5 Yellow-green
33