Kohler K-475 Guia De Instalacion página 5

Ocultar thumbs Ver también para K-475:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Locate the Wall Plate
Centerpoint
Level
For multiple-post layout only.
1. Prepare the Site — Wall Plate(s)
NOTE: Take into account the length of the accessory components to
determine the required distance between the post center points.
Refer to the "Roughing-In Information" section.
NOTE: Tissue holders generally rough-in at 8" (20.3 cm) to 12"
(30.5 cm) above the toilet rim and 6" (15.2 cm) in front of the toilet
bowl.
Mark the vertical and horizontal centerlines for each post. Use a
level to ensure that all center points are level.
NOTE: Once the pilot holes are drilled, there is no provision for
adjustment if the center points and the resulting pilot holes for
multiple-post accessories are not level with each other.
Using a compass, draw a 1" (2.5 cm) D. circle around the
centerpoint.
Center the holes of each wall plate on the guides. Make sure the
holes are oriented as illustrated.
Mark the hole locations.
Verify the marked locations are level.
2. Mark and Drill the Pilot Holes
Select a 5/16" drill bit appropriate for the wall material you will
be drilling through.
Kohler Co.
Wall Bracket Hole Locations
1"
Wall Bracket
(2.5 cm) D.
Holes
1/2"
(1.3 cm) R.
5
1020823-2-D

Publicidad

Tabla de contenido
loading

Tabla de contenido