Pre-Installation Requirements; Special Maintenance - Glass 1989 COLONNA+TETTUCCIO Installation, Operation And Maintenance Manual

Tabla de contenido

Publicidad

PRE-INSTALLATION REQUIREMENTS

GROUNDWIRE.
EQUIPOTENTIAL CONNECTION.
The
following
accessories
manufacturer are re uired for installation:
ROUTINE AND

SPECIAL MAINTENANCE

After cleaning, rinse thoroughly with plenty of water to
remove all traces of detergent and dry with a soft cloth.
A
:
VOID
IMPORTANT:
Rinse thoroughly with plenty of water to remove all traces
of detergent.
(not
supplied
by
the
.
TROUBLESHOOTING
All hydraulic connection checkup must be performed by a
hydraulic installation technician.
FUNCTIONING
1
B
A
Shower head / Large head / waterfall.
A
9
MIXER
2
B
A
EN

Publicidad

Tabla de contenido
loading

Tabla de contenido