Installation - Existing Construction - HAMPTON BAY 7134-01 Guía De Uso Y Cuidado

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation - Existing Construction

CAUTION: Turn off electricity at the breaker box before
beginning installation. Review all safety precautions.
1
Remove the existing fan
 Remove the old fan from the ceiling.
2
Measure the ceiling opening
 Measure the opening to assure it is large enough to accom-
modate the new fan body (A) (7.50 in. x 7.25 in.).
NOTE: 7.25 inch side of opening should be flush with the joist.
3
Enlarge the opening (optional)
 If this fan is not replacing an old fan, be sure to cut a
7.50 in. x 7.25 in. opening for the fan body (A).
MAKE SURE THE 7.25 IN. SIDE OF THE OPENING IS FLUSH
WITH THE JOIST FOR INSTALLATION FROM BELOW.
8

Publicidad

Capítulos

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

1001-419-055

Tabla de contenido