Klaxon Flashguard Value Instrucciones De Instalación página 4

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

1 Mounting and Assembly Instructions
Using the backplate of the unit (or the template on the rear of the carton) mark the positions of
G
the three mounting screw holes (A), and cable entry hole
Drill and plug the screw holes as marked.
G
Using a long masonry drill bit, drill a hole through the wall for the cable.
G
Pass the cable through the grommet in the cable entry hole
G
guide on the backplate. Mount the unit to the wall using the three screws provided.
Make the required connections to the terminal block as described in section 3 and 4.
G
Configure the jumpers as described in section 2.
G
Replace the lid and tighten screw.
G
2 Jumper Configuration
Battery (BATT) (D)
Once installed, this jumper must be moved to the ON position to connect
the battery. This will activate the automatic 5 second sound test.
The LED's will not illuminate until the hold-off voltage is applied.
Cut Off Timer - For the Sounder (F)
Can be set to either 3 or 15 minutes by putting the jumper on the
relevant pair of pins (Note: Completely removing the jumper
selects 3 minutes cut off time.)
SAB / SCB Operation (E)
Move jumper to SCB position to minimise the current drawn from
control panel. A reduction in sound level occurs in SCB mode.
Series Tamper (H)
This link must be cut when the tamper loops of two
sounders are connected in series to the same control panel.
(B).
(B)
and strip the cable using the
3
min
SCB
GB
On
Off
BATT
Timer
15
min
SAB
Series
Tamper
2

Publicidad

Tabla de contenido
loading

Tabla de contenido