M-13-05
LIFT CORPORATION
Sht. 8 of 48 DSG#
Date: 07/30/18
14. Bolt hand pump (Kit item) to mount-
ing bracket (FIG. 8-1).
BOLTING ON HAND PUMP
FIG. 8-1
15. Connect elbow, needle valve and
branch tee (Kit items) to "A" port
on the pump manifold (FIG. 8-2).
Do not tighten connectors until
later in this procedure.
BRANCH TEE
(P/N 906745-01)
CONNECTING "A" PORT FITTINGS AND
NEEDLE VALVE
FIG. 8-2
© MAXON Lift Corp. 2018