1) Assemble the wheel drop legs to the central beam
of the trolley.
2) Assemble the wheels in the axle housings and
tighten locking bolts.
3) Adjust the trolley height so that the frame is flat
on the ground (fig.11 a). For 5 wheeled trolleys
adjust the drop legs so that the rain gun works hori-
zontally (fig.11b).
4) Assemble the rain gun to the trolley.
ATTENTION: Use only slow rotation sprinkler guns with a rotation speed not grater than 1 RAD S-1..
5) For side traverse trolleys see (fig 12).
Wheel Type
4.5 – 10 6PR
15 . 6 . 00 x 6''
1) Fit the PTO winding handle to the gearbox
power takeoff shaft (fig.13).
2) Put the gearbox lever in the hose pull-out
position (fig.14).
3) Turn the reel anticlockwise by the handle and
pull out 3-4 metres of hose.
4) Secure the rain gun trolley to the flange lo-
cated at the (PE) hose end (fig.15).
5) Turn the reel clockwise and rewind the PE hose until the
limit stop hook has reached the stop position .
6)Operating the hand hydraulic pump or the spool valve if the
machine is not equipped with the pump.
1.3 NOISE LEVEL
SOUND PRESSURE LEVEL
Pos. 1
Pos. 2
Assembling the rain gun trolley
Fig.11a
Inflation pressure
Bar
3
2.5
Mounting the trolley to the machine
Fig.13
1
70 d B (A)
74 d B (A)
2
1,7 Mt
MAX 2,3
psi
43.5
Fig.12
36.3
Fig.15
1,5 Mt
MAX 2,5
Fig.11b
1,7 Mt
MAX 2,3
Fig.14
GB
16