5. Locate Hearth/Base (A) and completed assembly
from step 4, lie down on scrach free surface, Insert
wood dowel (CC) into the completed assembly from
the step 4, push the Hearth/Base to the completed
assembly from the step 4 as show in diagram,
tighten Screw (BB) through the pre-drilled holes.
Hardware Used
BB
Screw
Wood Dowel
CC
6. Insert Wood Dowel (CC) and screw (A-1) into the
pre-drilled holes of Left Block (S), make sure to
tighten (A-1). Push Left Block (S) snug to the Left
Side Panel (E). tighten Screw (BB) through the
pre-drilled holes.
Repeat with Right Block (T).
Hardware Used
Camlock
AA
(A-1,A-2)
BB
Screw
Wood Dowel
CC
7. Insert one Wood Dowel (CC) and Screw (A-1) into
each of the pre-drilled holes in the underside of
Mantel/Top (G) and lay fi nished side up on top of
completed assembly. From the inside, attach the
Mantel use a Phillips head screwdriver to tighten
(A-2).
Hardware Used
Camlock
AA
(A-1,A-2)
Wood Dowel
CC
Fig. 5
x 10
x 8
Fig. 6
x 2
x 2
x 4
Fig. 7
x 6
x 5
8
A
CC
A-1
A-2
CC
T
S
BB
CC
A-1
A-2
G
BB