Descargar Imprimir esta página

Cequent Performance Products 30126 Instrucciones De Instalación página 7

Publicidad

Idiomas disponibles

Idiomas disponibles

Step 16D :
One rail should be facing rearward and the other rail facing forward after the
installation. The rails should be centered with both ends of each rail resting
evenly on the frame.
17. Loosely attach frame brackets (#2 & 3) (Figure 1) to mounting kit rails using 5/8" X 1 3/4" (#10) (Figure 1) long
bolts, conical washer (#11) (Figure 1) (below bracket), conical washer (#11) (inside rail), and 5/8" nut (inside rail)
(#9) (Figure 12). Tighten all mounting kit bolts to hand tight.
Figure 12
Check for obstructions before drilling. Failure to do so could result in damaged fuel or brake lines, structural
members, etc. CEQUENT PERFORMANCE PRODUCTS, Inc. does its best to communicate tow vehicle
manufacturer changes; however, it is ultimately the responsibility of the installer to prevent damage due to
18. Loosely attach frame bracket to existing holes in chassis frame using M14 1.5 x 45 bolts (#10), conical washer
(#11) (Figure 1), and flange nut (#12) (Figure 1). Tighten to hand tight (Figure 13). Lifting truck bed gives easier
access to the driver's side nut and bolt.
30126N
16MAY17
REV G
DO NOT lubricate bolt threads. It may cause bolt failure.
Figure 13
PCN9762
©2011, 2014, 2017 HORIZON GLOBAL
WARNING:
CAUTION:
installation.
Front
7
PRINTED IN MEXICO

Publicidad

loading