Installation (continued)
5
Attaching supply lines
□
Identify hot and cold water supply valves below
sink. Connect and tighten the water supply line
nuts by using two adjustable wrenches (avoid
twisting or kinking).
Operation
1
Flushing and checking for leaks
□
Remove spray head (B) from faucet body (A).
□
Turn on water supply.
□
Flush out any debris. Check for leaks.
□
Replace spray head (B).
RED LINE
HOT
B
B
6
BLUE LINE
COLD
A
A