Installation Requirements
Tools and materials needed for installation:
OR
Adjustable
3/8" or
wrench
10 mm
box wrench
Inlet Hose (x2)
Shipping Hardware
Foam shipping support (in door gas-
ket) removed and stored
Shipping bolts and spacers removed
from rear of appliance and stored
Hole plugs (shipped in bag in drum)
installed in holes in backsheet
Leveling
Washer is level, side-to-side and
front-to-back
Cabinet is setting solid on all corners
Water Supply
Use only new hoses and verify rub-
ber sealing washers are installed
HOT supply is connected to HOT
inlet and COLD supply is connected
to COLD inlet
HOT and COLD water supply turned on
No leaks present at water supply
connections or appliance inlet
connections - recheck in 24 hours
OR
Ratchet and
socket set
NOTE
Hoses are not included with washer purchase. See "Accessories" section
for various inlet hose kits to fit your specific installation.
INSTALLATION CHECKLIST
OR
AND
Optional
Adjustable
universal
wrench
Drain
Stand pipe or wall drain height
minimum 24"
Drain hose snapped in "U" channel
(shipped in drum)
Drain hose secured in place with
cable tie (shipped in drum)
Electrical Power
House power turned on
Washer plugged in
Final Checks
Installation Instructions and Use
and Care Guide read thoroughly
Door locks and water enters drum
when cycle starts
4
AND
pliers
Carpenter's level