INSTALLATION ASSEMBLY BOX
9.
Inlet Assembly (including Inlet Tube and Outlet Tube)
10.
Back-Flush Adapter (for use on the Pre-Filter Cartridge only)
11.
Filter Base
12.
Locking Plate
13.
Battery Door (Batteries not included)
14.
Data Cable Port
15.
NanoCeram® Cartridge
16.
Pre-Filter Cartridge (Reusable Housing and one EM Media Insert)
17.
2 disposable EM Media Inserts
14
13
FILTER CARTRIDGES
17
If any of these items are missing, please contact Rena Ware Customer
Service
8
10
9
12
11
15
16
Installation
INSTALLING SWAN NECK SPOUT
IMPORTANT: Read all the instructions completely before proceeding.
If you are uncertain about installing this product, we recommend you
consult a professional. This product should be installed in accordance with
all local and state plumbing and building codes.
1. Locate hot water line: If you don't know which one is your hot water
line, open the hot water tap. Wait 30 seconds and feel the two water feed
lines under the sink. The one that is warm is your hot water feed line, the
other is your cold water feed line. Make a note of which is Hot and which
is Cold. Also make note which side each connects to the underside of the
existing faucet because the cold water line will be disconnected later in
the installation.
2. Shut off water supply: After locating the water supply inlets, shut off the
water supply valves. These are usually found under the sink or near the
water meter. If you are replacing an existing side faucet, remove the faucet
from the sink and clean the sink surface thoroughly.
3. Tools recommended: PTFE plumber's tape or thread sealant, slotted
screwdriver, pliers, adjustable wrench, flashlight, and cloth. Your
installation may require new supply lines and/or shut-off valves or other
additional tools.
9
EN