The vehicle unloading operations are the responsi-
bility of the recipient.
The CFF-ECM units must be stored in a dry place pro-
tected from the weather.
2
INSTALLATION
Mechanical installation
Install the unit in a position that does not compro-
mise the air intake (see p. 27).
Air flow
2.1
Version with casing
2.2
Version without casing
EN
27