In selecting a location for installation, it is necessary to provide
adequate accessibility clearances for servicing and proper
installation.
2.
Clearances to combustible surfaces are 4" (102mm) from sides,
12" (305mm) to top, 1 1/2" (38mm) from floor.
NOTE: Minimum distance of 1 1/2" (38mm) must also be maintained

VENTILATION AND COMBUSTION AIR

Wall furnaces shall be installed in a location in which the facilities
for ventilation permit satisfactory combustion of gas and proper
venting under normal conditions. In buildings of conventional frame,
brick, or stone construction without tight storm windows and doors,
infiltration is normally adequate to provide air for combustion and
draft hood dilution.
Select a location near the center of the space to be heated. Overflow
heat will circulate through doorways into adjacent rooms.
For large homes or spread-out floor plans, two or more furnaces are
recommended. Do not locate furnace where a door could swing
over the outer casing, or where circulation could be retarded by
furniture or cabinets.
Do not install in a closet, alcove or small hallway where the furnace
could be isolated by closing doors to the heated space.
When location is selected, check the walls, attic and roof to make
Provide an opening in the wall 14 1/2" (368mm) wide and 66 1/8"
(168cm) high measured from top of floor plate (See Figure 2 and
Figure 3). Wall depth is to be 2" x 4" framing with 1/4" (6.5mm) to
5/8" (16mm) sheeting. Attach baseplate (not supplied with furnace)
to header plate with sheet metal screws at each end. Attach 4"
(102mm) oval, double wall vent pipe to baseplate. Attach enough vent
pipe so that when installed in wall opening the vent pipe will extend
above the ceiling plate by at least 6" (152mm). Install ceiling spacers
according to manufacturer's instructions. Two header extensions
are attached to the header plate. One header extension is welded
to the header plate and one header extension is screwed to the
header plate. To install header plate into wall opening remove the
header extension that is screwed to the header plate (2 screws).
37410-6-0620

CLEARANCES

LOCATION - ALL MODELS

ROUGH-IN INSTRUCTIONS

from top surface of carpeting, tile, etc.
Where appliances are installed in confined and unconfined spaces
within a building, the building being of unusually tight construction,
air for combustion and ventilation must be obtained directly from
outdoors or from such spaces that freely communicate with the
outdoors. Under these conditions, the confined and unconfined
spaces shall be provided with two permanent openings, one near
the top of the enclosure and one near the bottom; each opening
shall have a free area of not less than one square inch (6.45cm
per 2,000 BTU (.6KW/H) per hour of total input.
sure there are no obstructions such as pipes, electric wiring, etc.,
which would interfere with the installation of the furnace or vent pipe.
NOTE: If Optional Blower is to be used, hard wiring must be
completed for the optional blower prior to installation of
header plate.
Insert header plate with attached 4" oval, double wall vent pipe
into wall opening. Position header plate at height shown in Figure
2. Locate rear edge of nailing flange at the back of the 2" x 4" stud
which will center the vent collar in the wall. Locate the angled edge
of header plate flush with the top of the wall opening. Nail header
plate to the wall studs. Replace and attach header extension onto
header plate with 2 screws.
)