WARNING: It is very important for the safety and efficiency of the system to use the
appropriate AC connection cables.
WARNING: Please use maximal protection according to the existing standards (circuit breaker,
differential current breaker). The circuit breaker mustprotectagainstcurrents exceedingthe
maximumoutput current of the inverter (17 A per phase). Use a circuit breaker Type A 30mA.
Note: The inverter current (battery + PV) cannot exceed 13Anominal per phase. In the case of grid
outage, make sure not to go over this figure.
Note: In case of the operation with PV only (grid outage and no battery), the AC BACKUP of the
inverter will not be activated.
Note: To prevent further supply to the load via the inverters AC BACKUP during any mode of
operation, an additional disconnection device should be placed in the buildings wiring
installation.
Step 1: Open the circuit breaker in order to work safely on the installation.
Step 2:Remove insulation sleeve and connect wires according to polarities indicated on the terminal
block. Be sure to connect PE protective conductor (
3.9.1 AC BACKUP Connection for IMEON 3.6
Step 1 : Wire the connector as defined in paragraph 3.3.
Step2: Make sure the wires are securely connected.
Step3:Plug the RST Connector in the AC BACKUP socket.
WARNING: Before plug-in in the cable, make sure there is no load on the circuit connected to
the AC BACKUP.
WARNING:AC BACKUP cannot be connected in parrallel to another IMEON and should not be
connected to the grid.
IMEON_installation_guide_rev D.5
) first.