Tools Required For Installation; Preparing For Installation - Steren STV-021 Manual De Usuario

Ocultar thumbs Ver también para STV-021:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

STV-021-V1.0-instr.pdf

Tools required for installation

Level drop
Steren not liable for damage and injury caused by misuse or impro-
per installation. It is your responsibility to ensure proper installation
and use of the product, and its periodic review.

Preparing for Installation

C
M
Use the stand base and the level of drop for drilling
marks on the surface where you want to install support.
Y
CM
MY
CY
CMY
K
When making holes, be careful that there are no hidden pipes with
electrical wiring, gas or water.
16
14/09/16
6:01 p.m.
(Not incluided)
Installation

Publicidad

Tabla de contenido
loading

Tabla de contenido