INSTALLATION (CDV155DPPD)
STEP 6.
Right Side Install
A. Bundle and loop the
B. Allow the free ends
WARNING:
Ensure wires
do not touch
combustion
C. Bundle and secure the
chamber.
OR :
Left Side Install
A. Bundle and loop the
WARNING:
Ensure wires
B. Allow the free ends
do not touch
combustion
chamber.
C. Bundle and secure the
SKIP TO STEP 7
wires, neatly settling them
on the valve bracket.
of the wires to extend to
the RIGHT, approximately
16" from the rear of the
valve bracket.
wires to each end of
the valve bracket with
two cable ties (64) as
illustrated.
wires, neatly settling them
on the valve bracket.
of the wires to extend to
the LEFT, approximately
16" from the rear of the
valve bracket.
wires to each end of
the valve bracket with
two cable ties (64) as
illustrated.
( PAGE 18 )
NOTE IF USING BLOWER KIT DVB3:
Attach the wires to the Blower Shield
A
B
16"
Page 14
B
16"
C
A
C
1019068-C