Connections; Chimney Connection; Testing And Commissioning; Controls And Use - Ravelli Alba Manual De Uso Y Mantenimiento

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 114
Rev.1 19/09/2017
Page 50
4

Connections

! IMPORTANT

Chimney connection

The chimney must be sized so as to guarantee the draught declared by the Manufacturer.

Testing and commissioning

Stove start-up must be preceded by testing, which includes an operational check of the following elements:
connection to the smoke evacuation system;
checking that all materials used to build the smoke duct, chimney and chimney pot are regulation and suitable for use.
The testing is positive only when all operational phases have been completed without any anomaly being detected.

Controls and use

Primary air lever
C
Use and maintenance manual Alba- Alba steel- Lia- Lia steel
The connections must be set up by a technician that is qualified and/or authorised by the
Manufacturer.
F
A
5
x4
C: primary air lever fully closed: this position must only be
maintained with the stove off and with extinguished flame and
embers.
F: primary air lever in central position (operating position):
this is the position for ideal operation at maximum power.
A: primary air lever fully open (lighting position): this is the
position required for the first phases of lighting.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

LiaAlba steelLia steel

Tabla de contenido