Preparation; Assembly Or Installation Instructions - allen+roth 1227VA-36-201 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

PREPARATION

Before beginning assembly of product, make sure all parts are present. Compare parts with
package contents list and hardware contents list. If any part is missing or damaged, do not
attempt to assemble the product.
Estimated Installation Time: 20-30 minutes (24 hours for silicone caulk to dry).
Tools Required for Installation (not included): Phillips screwdriver, utility knife or scissors,
silicone caulk, power drill with drill bit
Helpful Tools (not included): Measuring tape, level
INSTALLATION INSTRUCTIONS
1. To remove drawers preassembled in vanity (A),
fully extend drawers. Locate plastic levers on
metal glide tracks at left and right sides of
drawer box.
To disengage drawer box from glides, push on
plastic levers. Then, gently lift drawer up to
remove it from vanity (A).
1
A
1
4
2

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

0819968

Tabla de contenido