Davey EcoMatic COMM500 Instalación E Instrucciones De Funcionamiento página 107

Cloradores salinos comerciales
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Once a suitable location is selected, drill a 32mm diameter hole in the pipe.
Once a suitable location is selected, drill a 32mm diameter hole in the pipe.
Once a suitable location is selected, drill a 32mm diameter hole in the pipe.
Une fois l'emplacement approprié choisi, percer un trou d'un diamètre de 32 mm dans le tuyau.
Place the O-ring in the groove on the inside face of the top half of the pipe clamp.
Place the O-ring in the groove on the inside face of the top half of the pipe clamp.
Placer le joint torique dans la rainure sur la face intérieure de la moitié supérieure de la bride de tuyau.
Place the O-ring in the groove on the inside face of the top half of the pipe clamp.
Place the top half of the pipe clamp onto the pipe ensuring that the hole in the pipe cla
L'interrupteur de débit ne doit pas être positionné sur la face inférieure des tuyaux horizontaux.
the pipe.
Place the top half of the pipe clamp onto the pipe ensuring that the hole in the pipe cla
Place the top half of the pipe clamp onto the pipe ensuring that the hole in the pipe cla
the pipe.
the pipe.
107

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ecomatic comm1000Comm1000

Tabla de contenido