Info
We recommend installing the bathtubs to already finished
walls and flooring (already tiled or laid).
Built-in models
m
WARNING: for built-in models, inspection panels
should be installed on all sides (ref. 6).
Access can be closed off using removable panels. The system
must also be equipped with adequate ventilation, with holes
between the tub coating and the removable panels, or there
should be evenly spaced and fully unobstructed openings.
The panels must be securely attached and a suitable tool
must be used for their relative removal.
Openings, holes and grilles used for ventilation purposes must
not permit the infiltration of objects with diameter of Ø 12 mm.
Freestanding models
m
WARNING: for freestanding models, a space needs to
be left free for the tub during installation and for any
future maintenance or repair work.
2
3
Tub fixing system with brackets (S)
(freestanding models)
These models are equipped with brackets ("S", see data sheet)
which stop the tub from moving in the event of accidental
knocks or pressure.
In the event of maintenance work which requires the tub to
be moved, first move the tub in one direction or the other, de-
pending on how the brackets have been fixed. When preparing
the floor drain, please bear this in mind and position the pipe in
one of the two areas shown (1 or 1a).
m
Drain preparations and water connections
Please prepare the floor drain in the areas indicated (see the
technical data sheet, ref. 1/1a); for freestanding models, please
see the section "Tub fixing system with brackets (S)".
Water can be supplied via an external tap unit:
- for built-in models, position the outlet for the two pipes for hot
and cold water on the floor, as shown in ref. 5.
- for freestanding models, where the spout is installed on the
floor, make sure that the spout can also be removed (e.g. for
special maintenance work or to replace faulty parts).
m
4
Electrical wiring setup
(4x)
The power supply cable must be installed near the indicat-
ed position (see technical specifications, ref. 2), leaving it long
enough so it can be connected to the box (fastened to the
1
frame). The cable can follow various paths provided that there
are no loose connections; refer to the chapter on "Electrical
safety".
It is recommended to prepare the electrical power supply
with one single-phase line (voltage between phase and neu-
tral: 220-240V).
The device can be powered with a double phase line, provid-
ing that the voltage between phases is 220-240V.
Electrical safety
Jacuzzi®" hydromassage products are safe appliances, manu-
factured according to EN 60335.2.60, EN 55014-1, EN 55014-
2. They are tested during manufacturing in order to guarantee
user safety.
Installation must be carried out by qualified and authorized
personnel, in compliance with the national provisions in force.
6
When fixing the brackets to the floor, make sure you do
not drill through any pipes or wires.
Where "hard" water is present, it is advisable to install
a decalcifier in the water system supplying the appli-
ance, in order to reduce and/or avoid calcareous de-
posits.
ATTENTION: (IEC 60335-1/A2) The pressure of the wa-
ter system supplying water to the appliance must not
exceed 600 k Pa (6 bar).