Descargar Imprimir esta página

EcoSmart Fire 720CV Manual De Instalación página 5

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 14
CV Firebox Inserts
Installation
6. Apply surrounding gyprock/dry wall panels. Fix steel
end beads on all 4 edges (mitre the corners).
8. Insert the mounting frame into the cavity. Ensure the frame is
flush with the wall edge or the firebox will not sit flush. Secure the
mounting frame. Ensure screws are engaging the timber frames
behind the fire-retardant panels.
10. Ensure the glass screen is at the lowest position. Place the burner
into firebox tray. WARNING: Glass screen is fragile, careful not to
clip the screen during burner insertion or glass will shatter.
7. Plaster all seams and beads and paint to create the
finished wall appearance.
9. Push the firebox into the cavity. Push until the magnets engage
with the mounting frame.
11. Evenly spread decorative pebbles around the firebox base.
Position glass screen back up to its full height. Always operate
with the glass screen in full upright position.
OPERATE ACCORDING TO THE BURNER OPERATIONS
MANUAL INCLUDED WITH THE BURNER.
© Copyright 2004 - 2020 MAD Design Group. All rights reserved. V0720

Publicidad

loading

Productos relacionados para EcoSmart Fire 720CV

Este manual también es adecuado para:

920cv1100cv