Unit And Equipment Installation - Tripp-Lite SmartRack SRWF12U38 El Manual Del Propietario

Ocultar thumbs Ver también para SmartRack SRWF12U38:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

5. Installation

5.2. Unit and Equipment Installation

Side Panel Installation
1
After ensuring the Backplate is securely fastened to the wall or
2-post rack, install the Side Panels by inserting the Side Panel
hooks into the rectangular cutouts in the Backplate. Apply
downward pressure to properly seat the panels
Notes: The smooth surface of the Side Panels should face away from
one another.
All Side Panel hooks must be engaged for proper assembly.
After the Side Panels are seated, the top surface will be flush
with the internal 2U flanges in the Backplate. The bottom of the
Side Panels will be flush with the Backplate bottom. Two holes
for each Side Panel will align. Use four (4) supplied #12-24
screws for the two holes located in each Side Panel
all screws are firmly secured to the Backplate.
Vent Tray Installation
2
Slide the Vent Tray into the side panels' bottom slots. The right-
angle flanges of the Vent Tray should face upward toward the
cabinet's interior.
16-04-227-9335C5.indb 5
A
.
B
. Ensure
5
A
A
B
B
9/2/2016 10:19:03 AM

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Smartrack srwf16u38

Tabla de contenido