5. Installation
Front Panel Installation
3
Insert the Front Panel hooks into the rectangular cutouts in the
Side Panels. All hooks must be engaged for proper assembly.
Apply downward pressure to properly seat the panel. Secure the
Front Panel using (2) #6-32 Locking Screws.
Before installing the first piece of equipment,
make sure to temporarily install the Front Panel.
This allows uniform spacing of the Side Panels,
squares and aligns the cabinet, and ensures
proper seating of the locking cover. After the
first piece of equipment is securely installed,
the Front Panel and Vent Tray can once again be
removed to install any remaining equipment.

Equipment Installation

4
With user-supplied standard rack hardware (#12-24 screws),
vertically mount up to 8U (SRWF12U38) or 12U (SRWF16U38)
of network equipment
horizontally
B
.
16-04-227-9335C5.indb 6
A
, and up to 4U of patch panels
B
A
Cover Installation
5
Place cover onto the Side Panels and slide toward the
Backplate. When properly seated, the cover should be flush
against the Backplate and level with the top of the Backplate.
The cover may then be locked with either of the two (2) keys
provided.
6