COMEM T Manual De Instrucciones página 5

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Mounting of the duct
The duct must be mounted after installation of the pressu-
re relief device.
Put the duct on the housing flange centering the screws
on the hole. Screw the 3 screws with recommended
torque (12Nm).
2
3
4
RECOMMENDED TORQUE 12 Nm
6
4
5
3
2
1
Figure A
2
3
4
M Type
Mounting of the valve
To install the pressure relief device remove the duct first
(fig.B/7). Unscrew the 4 screws (fig.B/6).
The pressure relief device has to be mounted on the
preventively machined flange according to the drawing by
using:
• nuts UNI5588
• grower washers UNI1751
• plane washers UNI 6592
• Screw the nuts with recommended torque (20Nm for
50M). During the valve mounting, pay attention to insert
the 2 O-Ring gaskets included in the delivery (fig.B/1 e
fig.B/2).
Bleeding of the valve
If installed vertically pay attention that the bleed screw is
placed at the highest point.
In any case, both with horizontal and with vertical moun-
ting, it is necessary to bleed the valve after the filling of the
transformer.
Unscrew partly the bleed screw to allow the excess air to
come out. Then tighten the bleed screw.
5
6
7
1
2
A
B
C
D
E
5
6
7
F
G
H
1
2
Closing of the valve
The pressure relief device must be closed after the instal-
lation with the duct.
Put the duct on the housing flange centering the screws
(fig.B/6) on the hole. It is possible to close the valve moun-
ting the duct in the 4 possible positions, with an angle of
8
9
10
90° in respect to the position of the housing flange.
Screw the 4 screws with recommended torque (8 Nm /
5.9 Ft•Lbs).
The locking system (fig.B/10) ensures safe transportation and
must be removed before energize the transformer.
Maximum withstand pressure: 200 kpa.
3
4
5
RECOMMENDED TORQUE 8 Nm
12
11
10
9
8
7
RECOMMENDED TORQUE 8 Nm
LAST REVISION
NUOVA EMISSIONE - Issue
DESCRIPTION
TOLLERANZE GENERALI SECONDO - GENERAL TOLERANCES ACCORDING TO ISO 2768
MATERIAL
- - -
PROCESS
6
5
- -
CREATED BY
REVIEWED BY
Diego Boro
-
APPROVED ON
DOCUMENT KIND
-
Component Drawing
RESPONSIBLE COMPANY
TITLE / SUPPLEMENTARY TITLE
ASSEMBLY OIL DUCT PRD TYPE T
COMEM
-
RESPONSIBLE DEPARTMENT
ITABB-9AAE306693
DOCUMENT ID
NV-400
© COPYRIGHT ALL RIGHTS RESERVED
4
8
9
10
3
2
1
Figure B
3
4
5
11
12
A
CAUTION
B
6
C
7
D
E
F
G
REPLACED
REVISION
m
NO
SCALE
WEIGHT - kg
-
PART NUMBER
-
APPROVED BY
-
BASED ON DOC ID
WORK ORDER ID
PROJECT ID
H
STATUS
REV
ITER
SHEET
A
Development
2
1/1
11
12
DRAWING SHEET ISO 5457:1999-A2T
6
7
8
LAST REVISION
DESCRIPTION
MATERIAL
- - -
PROCESS
- -
CREATED BY
Diego Bo
APPROVED ON
-
RESPONSIBLE
COMEM
RESPONSIBLE
ITABB-9A
8
5

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

M

Tabla de contenido