!
CAUTION
Reagent
Commissioning
Handling of reagents/indicators
Incorrect handling can result in personal injuries and/or damage to
the instrument or plant components.
Adhere to the respective safety data sheet!
Trouble-free operation of Testomat 2000
using Heyl Testomat 2000
Inserting the indicator bottle
Open the lower housing door by pulling on the right-hand side.
Remove the cap from the indicator bottle.
Remove the plastic bag from inside the lower housing door. The
plastic bag contains the screw cap with hole
for the screw cap.
Connect the parts as shown on the left.
Screw the hose connector
.
the insert
Place the insert with the screwed-in intake hose into the indicator
bottle.
Now screw the screw cap with hole
indicator bottle.
Extracting the indicator
Switch the instrument on and press the "STANDBY" key.
During operation, the pump (DOSIClip)
indicator.
To ensure that indicator is available for the initial analyses, the
intake hose
and the transport hose
indicator from the pump up to the measuring chamber.
Press the "manual"
and the transport hose
measuring chamber (always switch on the instrument at the mains
switch first!)
If necessary, manually tighten the hose connectors of the intake
and transport hose slightly in case of bubble formation.
Opening the water inlet
Open the lower housing cover.
Slowly open the manually operated shut-off valve to prevent the
measuring chamber overflowing. The flow regulator requires a few
seconds to function correctly.
Make sure that the water conducting parts are not leaky.
®
®
indicators!
of the intake hose
hand-tight onto the
must be filled with
key several times until the intake hose
are filled with indicator up to the
Commissioning
is only possible when
and the insert
hand-tight into
automatically extracts
19