Complete The Installation - Kohler K–T16119 Guia De Instalacion

Grifería de montaje en cubierta o bañera
Ocultar thumbs Ver también para K–T16119:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Discard Sleeve.
Stem Extension
Valve Stem
ValveBody
4. Install Handles
Remove the plaster guards.
Remove and discard the threaded sleeves.
Press a stem extension onto each valve stem.
NOTE: A spline adapter is provided in addition to the stem
extension, and is the shorter of the two pieces. The spline adapter
will not be used in deck and bath-mount installations.
Press the handle loosely onto the spline adapter, and check the
alignment of the handle.
For further alignment, remove the handle, and reposition the
spline adapter on the valve stem until the handle alignment is
correct.
Apply a ring of plumbers putty or other sealant around the
underside of the handle skirt according to the manufacturer's
instructions.
Thread the skirt of each handle onto each valve.

5. Complete the Installation

Turn off the water (hot = clockwise, cold = counterclockwise).
Remove the aerator assembly.
Turn on the main water supply and check for leaks.
113341-2-BD
Handle and
Skirt (Lever
Handle Shown)
Apply plumbers
putty.
Stem Extension
6
Kohler Co.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

K–t16122K–t16124

Tabla de contenido