EN
THREADING THE UPPER LOOPER THREAD
According to color threading diagram,
follow the 4-8 steps (go down).
94
Note: Please use the tweezers in
accessories box to help threading.
Follow the 1-3 steps.
The thread from front to back into the
upper looper hole (8), then pull about
10cm of thread through the upper looper
hole and put it on the presser foot.
Texi Integra 5