INSTALLATION INSTRUCTIONS
2. Remove bottom drawer preassembled in
vanity (B) by fully extending drawer. Locate black
plastic levers on metal glide tracks at left and right
sides of drawer box. To disengage drawer box
from glides, simultaneously push down on right
plastic lever and up on left plastic lever while
gently pulling out drawer.
3. From inside vanity (B), drill hole through vanity
mounting area and into marked locations from
step 1. Using mounting hardware (not included)
appropriate for your installation site, secure
vanity (B) to wall stud. If possible, secure vanity (B)
to two wall studs for increased stability.
CAUTION: Use a level (not included) to ensure the
vanity (B) is level.
2
2
3
B
4
2
Lowes.com