9
Clear any debris from opening before sliding in unit.
Slide bathtub into opening. Verify bathtub aligns with marks
made in Step 6.
11
Attach waste assembly to unit (not included). Follow
manufacturer's assembly instructions.
10
Gap
CAUTION: DO NOT screw bathtub into side and wall
studs.
If screws are installed into the side studs, the upper tub
wall will not install properly.
12
Secure base to studs. Start in the center rear stud and work
your way toward sides. Secure apron per the illustration
above.
CAUTION: Take care not to blemish the unit with drill
chuck.
6
13
Clear any debris from opening before sliding in unit.
Confirm that supply lines and valve(s) have been installed
per all applicable plumbing codes.
15
Check for plumbing locations. Mark locations for plumbing
fixtures.
14
Lower valve side of wall. Ensure pins go through holes on
lower wall.
16
Remove lower wall.
7