Oil Filling; Top Up Oil - Cooper Tools CLECO 20PH Serie Manual De Instrucciones

Aprietatuercas de impulso
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

20PH
6.6 O
F
IL
ILLING
Before the filling the pulse unit must be tightened to the
required torque.
1. Connect the pulse unit to the quick disconnect coupling using the
adapter <A2>.
2. Close the shut-off valve.
3. Connect air supply of approx. 5 bar.
4. Slowly open the shut-off valve fully, until the vacuum pressure
gauge shows approx. 1 mbar (-1 bar).
5. Wait for approx. 2 minutes until the number of vacuum bubbles
has decreased substantially.
6. Slowly close the shut-off valve. The pressure gauge indicates
atmospheric pressure again. Missing oil is pressed into the pulse
unit.
7. If necessary, repeat the steps 4. to 6. until no more bubbles come
out.
8. Disconnect the pulse unit, remove the adapter and add a few
drops of oil with syringe <B>.
-
Install the ball <67>/<97> and tighten the set bolt <68>/<98>.
O
F
U
<A>
IL
ILLING
NIT
Silencer
Ultra-Vac
Oil: ESSO UNIVIS J26
Order-No. 925715
Container volume approx.
150 ml
Temperature 20°±5°C
Shut-off valve
Air supply 4.5 - 5.5 bar
10
All manuals and user guides at all-guides.com
6.7 T
-
Remove set bolt <68>/<98>. Remove ball <67>/<97> by turning
the drive shaft <59>/<92>, keeping the opening away from the
body.
-
Carry out oil filling, see 6.6.
P1615E 11/99
O
OP UP
IL
Vacuum pressure gauge
Filling unit <A1>
Quick disconnect coupling
Connector <A2>
(comes with oil filling unit <A>)
Set bolt <68>/<98>
Ball <67>/<97>
Pulse unit <39>/<72>
CLECO

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Cleco 20phl703Cleco 20phl70qCleco 20phs703Cleco 20phs70q

Tabla de contenido