3. Raise reservoir to "Up" position, latch on housing by
pressing back on latching tabs. (See Figure 3)
4. Place two S-11507 Pure Flow 1000® Saline Cartridges
on the shelf. Nozzle assembly must be in front.
(See Figure 4)
5. Pull green latch tabs forward to drop down reservoir,
ensuring that plates are seated on bags and are not
resting on the cartridge boxes. (See Figure 5)
6. Replace cover. (See Figure 6)
PAGE 2 OF 12
CARTRIDGE INSTALLATION CONTINUED
Figure 3
Latching
Tabs
Figure 4
Figure 5
Figure 6
Reservoir
Reservoir
Plates
0521 IH-1297