Uline PURE FLOW 1000 H-1297 Manual De Instrucciones página 3

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

7.
Remove rubber bands from activating strap and
nozzle. Extend activating straps to the side. Do not
pull on the straps. (See Figure 7)
8. Snap right-hand nozzle into place on white nozzle
plate. An audible 'click' will be heard to confirm that
the nozzle is engaged. (See Figure 8)
9. Snap left-hand nozzle into place on white nozzle
plate. An audible 'click' will be heard to confirm that
the nozzle is engaged. (See Figure 9)
10. Position the two black straps over top of the
activation door with the expiration date and batch
number visible. Do not twist or cross straps. Close
activation door. (See Figure 10)
PAGE 3 OF 12
CARTRIDGE INSTALLATION CONTINUED
Figure 7
Figure 8
Figure 9
Figure 10
0521 IH-1297

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Pure flow 1000 s-11507

Tabla de contenido