Kohler STERLING 4700 Serie Guía De Instalación Y Cuidado página 8

Puertas corredizas de ducha
Ocultar thumbs Ver también para STERLING 4700 Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Front Side
3. Position the Bottom Track
Drill the Guide Holes
Divide the final length of the bottom track by 4.
From one end of the bottom track, measure the determined distance and mark the bottom track on
the V-Groove.
Repeat with the other end of the bottom track.
Determine the centerline of the bottom track and mark the V-Groove.
Place a guide on the bottom track and align the hole in the guide with the mark on the V-Groove.
IMPORTANT! Do not install the guides at this time.
Using the hole in the guide as a template, drill a 1/8" diameter hole through the bottom track.
Repeat at opposite side of the bottom track and center guide locations.
Position the Bottom Track
Place the bottom track on the flattest part of the bath/shower ledge with the leg toward the outside
of the shower.
Position the bottom track so there is an equal gap at both ends of the bottom track.
Temporarily secure the bottom track to the ledge with masking tape.
Mark the ledge along the front edge of the bottom track with a soft pencil.
1054391-2-D
(Bottom Track)
This side toward inside
of shower.
V-Groove
Front Side
Guide
1/4 of bottom
track length
8
Bottom Track
Inside of Shower
V-Groove
1/4 of bottom
track length
Centerline
Sterling

Publicidad

Tabla de contenido
loading

Tabla de contenido