10. Once cable has been passed through hole,
connect each end to respective terminal, placing
each one in the right path. Close box. (See Figure 6)
11. After installing cable, replace screws to close cover.
(See Figure 7)
PAGE 4 OF 21
INSTALLATION CONTINUED
12. Place hand dryer on wall bracket. (See Figure 8)
Figure 6
13. Remove air intake filter and secure hand dryer
Figure 7
14. After installation, wait six minutes for electrical
through inner hole. Insert filter and connect unit.
(See Figure 9)
Air Intake Filter
calibration then test hand dryer by placing hands
inside drying cavity. As soon as hands are removed
air flow should stop.
Figure 8
Figure 9
0621 IH-7862