Accessories Supplied; Installation - Teka DBV-60 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 1
Accesories supplied
1
Support for tubecover.
4
Wall plugs (Ø8 x 40).
4
Long bolts (Ø5 x 45).
2
Wall plugs (Ø6 x 30).
2
Long bolts (Ø4 x 30).
2
Ø6,4 x Ø18, washers.
2
Screws (Ø3,9 x 13).
2
Clips.

Installation

Fig. 1 (Page 31)
On installing the kitchen hood make sure
that the Safety Instructions set out on page
10 are complied with.
To obtain optimum performance, the external
conduct must not be more than FOUR
METRES long, have no more than two 90°
angles and its diameter must be at least Ø120.
1) Trace and drill the points for fitting the wall
plugs onto the wall (A1) (Ø8 x 40). See figure
nr. 1.
2) Fit the wall plugs (A1) and screw in the long
bolts (A2) (Ø5 x 45) leaving them protruding 5
mm out of the wall.
3) Attach the kitchen hood to the long bolts
(A2). Straighten the apparatus and tighten the
long bolts.
4) Trace the location of the wall plugs (R) (Ø8
x 40), through the inside of the kitchen hood.
5) Loosen the long bolts (A2) and take the
kitchen hood off.
6) Drill into the wall and fit the wall plugs (R).
7) Attach the kitchen hood, tighten the long
bolts (A2) and (S) (Ø5 x 45) with the washers
(T) (Ø6,4 x Ø18).
8) Mount the tubecovers. Lift the upper
tubecover up to the desired height and mark its
shape on the wall. Remove the tubecovers.
9) Fit the clips (F) to the support (C).
10) Centre the support (C) around the shape
marked; trace and drill the fixing points for the
wall plugs (E) (Ø6 x 30). Attach the support (C)
with the long bolts (D) (Ø4 x 30).
11) Attach the inner tube with a clamp (not
supplied) to the outlet of the valve.
12) Once the inner tube is fitted, fit the lower
tubecover around the extractor fan outlet and
attach the upper tubecover with the screws (G)
(Ø3,9 x 13).
13

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Dbv-70Dbv-90

Tabla de contenido