30" GAS SLIDE-IN RANGE INSTALLATION INSTRUCTIONS
8.
Range Installation
Important Note: Door removal is not a requirement for
installation of the range, but is an added convenience.
Refer to the Use and Care Guide for oven door removal
instructions.
Standard Installation
The range cooktop overlaps the countertop at the
1
sides and the range rests on the floor. The cooktop
is 31 1/2" (80 cm) wide.
Install base cabinets 30" (76.2 cm) apart. Make sure
they are plumb and level before attaching cooktop.
2
Shave raised countertop edge to clear 31 1/2" (80
cm) wide range top rim.
Install cabinet doors 32" (81.3 cm) min. apart so as
3
not to interfere with range door opening.
4
Cutout countertop exactly as shown on page 1.
Make sure the four leveling legs (front and rear) are
5
setup higher than the height of the cabinet (shown
on page 2).
Install the anti-tip bracket at this
point before placing the range at its final
6
position. Follow the installation instructions on
page 11 or on the anti-tip bracket template
supplied with the range.
To provide an optimum installation, the top surface
of the countertop must be level and flat (lie on the
same plane) around the 3 sides that are adjacent to
7
range cooktop. Proper adjustments to make the top
flat should be made or gaps between the
countertop and the range cooktop may occur.
To reduce the risk of damaging your
8
appliance, do not handle or manipulate it by the
ceramic glass. Manipulate with care.
(Models with Sealed Top Burners)
9
10
11
12
IMPORTANT
Installation For 29" Existing Cutout Wide Opening
1.You must replace the actual side trims by new and
2.Follow instructions supplied with your new side
3.Check if the countertop and cabinet opening are
4.Install range as in the "Installation without side
Installation With Backguard
The cutout depth of (21 3/4" (55.2 cm)Min., 22 1/8"
(56.2cm) Max.) needs to be increased to 24" (61 cm)
when installing a backguard.
Installation With End Panel
A End Panel kit can be ordered through a Service
Center.
Installation With Side Panels
A Side Panels kit can be ordered through a Service
Center.
Install cabinet doors 32" (81.3 cm) min. apart so as
not to interfere with range door opening.
7
Position range in front of the cabinet opening.
Make sure that the glass which overhangs the
countertop clears the countertop. If necessary, raise
the unit by lowering the leveling legs.
Level the range (see section 9). The floor where
the range is to be installed must be level. Follow
the instructions under "Leveling the Range".
Slide the range into the cutout opening.
If Accessories Needed :
smaller side trims. These new side trims can be
ordered through a Service Center.
trims to replace the actual side trims with the new
ones.
prepared for 29" cutout wide opening in
"Countertop Preparation" section (see page 4).
panels" section.