Please read completely through the instructions and verify that all listed parts and hardware are present
before beginning assembly.
A- Top Panel (Qty. 1)
D- Fixed Shelf
(Qty. 1)
G- Drawer Front
(Qty. 1)
J- Drawer Left Side Panel
(Qty. 1)
(1) 1/4" x 1/2" Bolt
(Qty. 18+1 extra)
(4) M4 x 15 mm Screw
(Qty. 7+1 extra)
Parts and Hardware List
B- Left Leg (Qty. 1)
E- Middle / Bottom Shelf
H- Drawer Back Panel
K- Drawer Right Side Panel
(2) M4 x 12 mm Bolt
(Qty. 29+1 extra)
(5) Handle
Tools required: Phillips screwdriver (not provided).
(Qty. 2)
(Qty. 1)
(Qty. 1)
(Qty. 1)
3
C- Right Leg (Qty. 1)
F- Back Panel
(Qty. 1)
I- Drawer Bottom Panel
(Qty. 1)
L- 12" Drawer Slides
(Qty. 2)
(3) M4 x 25 mm Bolt
(Qty. 2)
(6) Floor Leveler
(Qty. 4)