Before drilling holes in the pickup bed, ensure there are no obstructions or
items that could be damaged.
5. Hold RH mounting bracket against cor-
ner post of the pickup bed (FIG. 13-1).
Then, use 2 of the 4 bracket holes that
are not obstructed, to drill 2 holes for
(FIG. 13-1). Repeat for LH mounting
bracket.
6.
of pickup bed as shown in FIG. 13-1.
Repeat for LH mounting bracket.
7. Unlatch and unfold platform. Refer
to C2 Operation Manual if needed.
Then, adjust liftgate position so plat-
form is level from front to back.
8. Securely tighten 3 bolts fastening
RH mounting bracket to main frame
bracket (FIG. 13-1). Ensure the split
lock washers are not in the slotted
holes on main frame bracket. Repeat
for LH mounting bracket.
LIFT CORPORATION Sht. 13 of 52 DSG#
INSTALLING LIFTGATE - Continued
CAUTION
M-14-28
3/8"-16 HEX BOLT
(2 PLACES)
TEMPLATE HOLES
TO DRILL 2 HOLES
IN PICKUP BED
3/8" FLAT WASHER
(2 PLACES)
3/8" LOCK WASHER
(2 PLACES)
3/8" HEX NUT
(2 PLACES)
BOLTING RH MOUNTING BRACKET
TO PICKUP BED (LIFTGATE NOT SHOWN)
Rev. D Date: 08/13/19
CORNER
POST
FLOOR OF
PICKUP BED
FIG. 13-1