Carrier 42QHG009D8S Serie Manual De Instalación página 19

Ocultar thumbs Ver también para 42QHG009D8S Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

2. Tighten the flare nut as tightly as
possible by hand.
3. Using a spanner, grip the nut on the unit
tubing.
4. While firmly gripping the nut on the unit
tubing, use a torque wrench to tighten
the flare nut according to the torque
values in the Torque Requirements
table below. Loosen the flaring nut
slightly, then tighten again.
Outer Diameter of
Pipe (mm)
ø6.35 (ø0.25")
ø9.52 (ø0.375")
ø12.7 (ø0.5")
ø16 (ø0.63")
ø19 (ø0.75")
DO NOT USE EXCESSIVE TORQUE
Excessive force can break the nut or damage the refrigerant piping. You must not exceed
torque requirements shown in the table above.
Instructions for Connecting Piping to Outdoor Unit
1. Unscrew the cover from the packed
valve on the side of the outdoor unit.
2. Remove protective caps from ends of
valves.
3. Align flared pipe end with each valve,
and tighten the flare nut as tightly as
possible by hand.
4. Using a spanner, grip the body of the
valve. Do not grip the nut that seals the
service valve.
5. While firmly gripping the body of the
valve, use a torque wrench to tighten the
flare nut according to the correct torque
values.
TORQUE REQUIREMENTS
Tightening Torque
(N•m)
18~20 (180~200kgf.cm)
32~39 (320~390kgf.cm)
49~59 (490~590kgf.cm)
57~71 (570~710kgf.cm)
67~101 (670~1010kgf.cm) 23.2~23.7 (0.91~0.93")
Valve cover
Flare dimension (B)
(mm)
8.4~8.7 (0.33~0.34")
13.2~13.5 (0.52~0.53")
16.2~16.5 (0.64~0.65")
19.2~19.7 (0.76~0.78")
6. Loosen the flaring nut slightly, then
tighten again.
7. Repeat Steps 3 to 6 for the remaining
pipe.
USE SPANNER TO GRIP MAIN
BODY OF VALVE
Torque from tightening the flare nut can
snap off other parts of valve.
Flare shape
90°±4
B
R0.4~0.8
R0.4~0.8
Page 17-GB

Hide quick links:

Publicidad

Tabla de contenido
loading

Tabla de contenido