Uline FLASH FLOOD H-7917 Guia De Inicio Rapido página 2

Estación lavaojos secundaria
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

This is a secondary eyewash and must be placed in an
accessible location near the hazard.
1.
Unit must be level.
2. Mounting must support the weight of the unit (14 lbs.)
plus weight of the individual leaning on it.
3. Position the screw holes on unit 38¾ – 50¾" from the
floor. (See Figure 1)
Figure 1
38¾ x 50¾"
4. Tape the enclosed template onto a flat,
unobstructed wall surface.
5. Ensure the line between mounting screws is level
and template sides are square. (See Figure 2)
Figure 2
PAGE 2 OF 12
INSTALLATION
6. Drill pilot holes through template using 9/64" drill.
(See Figure 3)
Figure 3
7.
Remove template. (See Figure 4)
Figure 4
8. Remove funnel with perforator from body and set
aside. (See Figure 5)
Figure 5
0521 IH-7917

Publicidad

Tabla de contenido
loading

Tabla de contenido