Irrigation Planning - Rain i-dial Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 30

IRRIGATION PLANNING

The I-Dial controller is designed with 4 completely
independent programs (A, B, C, D).
Each program allows for a daily start and can be com-
bined with one or more electric valves.
The start time identifi es the opening of the fi rst electric
valve coupled with the program, the opening of next
electric valves will occur sequentially.
Programming is simple by following three easy steps.
Step 1: Start time setting
(start time)
SPA
start time
Start time is the time the irrigation cycle will begin.
Turn the dial to the symbol that indicates START TIME,
the display will begin to blink. Using the the + and –
buttons the desired starting hour can be modifi ed and
to confi rm press ENTER. Then repeat this step to select
the minutes and press ENTER to confi rm.
24
Step 2: Duration setting for each area
(duration zone)
duration
PROG
A
START
TIME
Duration is the time set for each cycle of irrigation.
Turn the dial to the symbol that represents DURATION
ZONE and the display will begin to blink. Increase or
decrease the required time using the + and – buttons
(the minimum duration is 1 minute and the maximum
240 minutes) press ENTER to confi rm. Repeat the proce-
dure for all zones.
Please note that if the duration of a zone is set to
0, the valve will remain closed and watering will not
occur.
SPA
zone
RAIN s.p.a.
via Kennedy 38/40
20023 Cerro Maggiore
ITALY (MI)
PROG
A
DURATION ZONE

Publicidad

Capítulos

Tabla de contenido
loading

Productos relacionados para Rain i-dial

Tabla de contenido