Scope Of Delivery; Installation; Prescribed Installation Method - Dometic COOLAIR SP950C Instrucciones De Montaje

Ocultar thumbs Ver también para COOLAIR SP950C:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 34
CoolAir SP950C/SPX1200C
5

Scope of delivery

Part designation
CoolAir compressor unit
SP950C
SPX1200C
Installation material
Installation manual
6

Installation

A
NOTICE! Damage hazard
The parking cooler may only be installed by qualified personnel from a
specialist company. The following information is intended for specialists who
are familiar with the guidelines and safety precautions to be applied.
6.1

Prescribed installation method

The compressor unit (fig. 1 1) is attached to the firm and straight rear panel of
the cab or by means of a firm fastening frame.
I
NOTE
The connection line (fig. 1 3) can only be installed after fitting the evaporator
unit and the compressor unit.
The parking cooler with rear panel evaporator unit consists of the following
components (fig. 1):
• CoolAir SP950C/SPX1200C compressor unit (1)
• CoolAir SP950I/SPX1200I rear panel evaporator unit (2) with connection
line (3)
The parking cooler with roof evaporator unit consists of the following
components (fig. 1):
• CoolAir SP950C/SPX1200C compressor unit (1)
• CoolAir SP950T/SPX1200T roof evaporator unit (4) with connection line (3)
EN
Scope of delivery
Quantity
1
1
1
7

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Coolair spx1200c

Tabla de contenido