3. Mise en place de la plaque de fondation
Positionner au sol la plaque de fondation suivant les côtes de la figure 1, avec 4 tirants à pression en
acier T (Il est important que la plaque soit parfaitement fixée au sol).
N.B. A travers les trous F, faire passer une gaine de protection pour les fils d'alimentation électriques
du motoréducteur.
3. Puesta en posición de la plancha de fundición
Posicionar en tierra la pancha de fundición siguiendo las cotas de la figura 1, mediante 4 tacos de presión de
acero T (en cualquier caso la plancha debe estar perfectamente anclada a tierra).
NOTA: Pasar por los agujeros F un tubo adecuado para los cables de alimentación del operador.
4. Fissaggio cremagliera
4.1 Cremagliera in nylon (fig.2)
Posizionare la cremagliera ad un'altezza di 125÷126 mm dalla testa del dente cremagliera alla base su cui
andrà fissata la piastra di fondazione; forare e filettare M6 il cancello circa nella mezzeria delle feritoie
cremagliera. Fissare poi la cremagliera rispettando i punti 4.3 e 4.4.
4.2 Cremagliera in Fe 12x30 mm (fig.2)
Posizionare i distanziali D saldandoli o avvitandoli sul cancello ad un'altezza di 144÷145 mm dalla piattaforma
su cui andrà fissata la piastra di fondazione dell'attuatore e ad un passo pari alla foratura sulla cremagliera.
Fissare infine la cremagliera rispettando i punti 4.3 e 4.4.
4.3 Rispettare il passo di dentatura anche tra uno spezzone di cremagliera e l'altro; a tale scopo può essere
utile accoppiare un'altro spezzone di cremagliera (vedi fig.2).
4.4 Fissare infine la cremagliera con le viti V, avendo cura, una volta installato l'attuatore, che rimanga ≈1 mm
di gioco tra cremagliera e ruota di trascinamento (vedi fig.3); a tale scopo usufruire delle asole sulla cremagliera.
4. Rack fixing
4.1 Nylon rack (fig. 2)
÷
Place the rack at a height of 125
126 mm from the base of the foundation slab up to the rack tooth
head; drill and thread M6 the gate approx. in the center line between the rack slots. Now secure the
rack and refer to points 4.3 and 4.4 before proceeding.
4.2 Fe 12x30 mm rack (fig. 2)
÷
Weld or screw the spacer pins D onto the gate at 144
145 mm above the base of the foundation
actuator slab and maintain the same pitch as the rack drilling. Now secure the rack and refer to points
4.3 and 4.4 before proceeding.
4.3 Keep the pitch of teeth between the two parts of the rack; the joining with another piece of rack
would make it easier to achieve (see fig. 2)
4.4 Secure the rack with the screws V making sure, once the actuator has been installed, that between
rack and the drive gear there is always approx. 1 mm clearance (see fig. 3); to get this clearance use
the slots on the rack.
4. Befestigung der Zahnstange
4.1 - Zahnstange aus Nylon (Bild Nr. 2)
Die Zahnstange auf eine Höhe von 125÷126 mm von der Grundfläche der Fundamentplatte bis auf die Zahnspitze
der Zahnstange positionieren; das Gitter durchbohren und ein Gewinde M6 schneiden (ca. mittig in den Zahnstangen-
nuten). Zahnstange befestigen, den Punkten 4.3 und 4.4. folgend.
4.2 - Zahnstange aus Stahl 12x30 mm (Bild Nr. 2)
Die Distanzstiften D auf eine Höhe von 144÷145 mm von der Grundfläche der Fundamentplatte in das Gitter
schweißen oder einschrauben. Der Abstand zwischen den Distanzstiften muß dem Abstand zwischen der, in der
Zahnstange gefräste Nuten, entsprechen. Die Zahnstange entsprechend den Punkten 4.3 und 4.4 befestigen.
4.3 - Die Zahnteilung zwischen den Zahnstangenstücken muß außerdem eingehalten werden; zu diesem Zweck
9

Publicidad

Tabla de contenido
loading

Tabla de contenido