Watts CO-190-PR Instrucciones De Instalación página 5

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

6. Finished floor slab should be poured flush with the top of the plastic leveling cap.
The floor surface may require hand finishing the concrete if the drain is above the
floor surface.
View After Concrete Is
Poured & Label Is Re-
moved
Removing Protective Label & Plastic Cap
• Once concrete is cured, remove the protective label on top of the plastic top
assembly to expose the two recessed slots on each side to the bubble level.
• Loosen the three 10-24 screws.
• Adjustable pliers may be needed to break the plastic top assembly loose from
the concrete seal.
• Use the back of the pliers, or a hammer to tap against the plastic top assembly.
• Continue tapping until a visible crack forms around the perimeter of the top
assembly.
• The top should loosen and separate from the concrete by using the pliers to
grasp the edge tabs around the recessed screw holes and popping the top
up. (A straight edge screwdriver may also be used to pry the top up)
Do not use excessive force when tapping against the cover. Excessive
force may cause pliers to slip and cause damage to the concrete floor.
Adjust After Concrete Pour
0-1" Adj.
0-1" Adj.
Post-Pour
Post-Pour
2 13/64"
2 13/64"
(56)
(56)
5

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Co-190-pr-60Co-1190-prCo-1190-pr-60

Tabla de contenido