Installation
Assembly of Components — S19-270HD, S19-270HW,
1.2
1.1
Wall-Mount Eyewash
Eyewash Assembly rotated ¼ turn
Shown in the "OFF" position
Bradley • 215-1408 Rev. M; ECN 12-05-003C
S19-270HD, -270HW, -270JD, -270JW, -280D, -280W, -290D, -290W
S19-280D, S19-280W
1.4
1.3
Shown in the "ON" position
1.5
1.6
1.8
1.7
1.9
1.10
1.11
1.12
R
P.O. Box 309, Menomonee Falls, WI 53051
4
TEST THIS UNIT EACH WEEK
DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN.
ESSAI HEBDOMADAIRE
Test-operate valve(s) each week and sign below.
Report any malfunctions immediately.
Ventil(e) wöchentlich im Testbetrieb prüfen, bestätigt
durch Unterschrift. Jegliche Störung sofort melden.
Test le fonctionnement des valves chaque semaine et
signe en bas. S'il y à quelque chose qui ne va pas fait
un rapport immédiatement.
Date
Signed
Date
Signed
Datum
Unterschrift
Date
Signed
Date
Signe
Date
Signed
3
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL: 1-800-BRADLEY
FAX: (262-251-5817)
http://www.bradleycorp.com
114-051
10/30/2012
1.13
1.14
1.15
1.16
1.17
2
1.18
5