In Combination With The Crs 845 Tester Set And The Cp 3.X Supplementary Equipment Set - Bosch CP 2 Indicaciones De Conexión Y Manejo

Ocultar thumbs Ver también para CP 2:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

6.2

In combination with the CRS 845 tester set and the CP 3.x supplementary equipment set

8
7
5
6
9
4
1
2
3
Figure 3: Hydraulic connection
Procedure:
1. Connect the lubricating oil supply (1) and lubricating oil return (2) lines.
2. Connect the supply (3) and return (4) of the pre-delivery pump.
3. Connect the supply (5) of the metering unit (FMU) with the temperature sensor (6).
4. Connect the high-pressure outlets (7).
5. Connect the pump overflow (8).
6. Connect the temperature sensor (6) with the connector cable (9) to the BNC socket
of the KMA 802 measuring device.
11

Publicidad

Tabla de contenido
loading

Tabla de contenido