I
R
E
S
NSTALLING
EMOTE
VAPORATOR
ECTION
8. Once the suction line is connected, the sponge insulation must be
pulled up to cover the quick connects. Tie or tape off the insulation to
prevent air infiltration and reduce water/ice formation on the suction
line.
All valves are open and the system is ready for operation. Remember,
the refrigeration couplings on this system are self sealing and, if the
need ever arises, the couplings may be disconnected without any loss
of refrigerant.
IMPORTANT: Since this system is equipped with pre-charged
refrigerant lines, it is the installing contractor's responsibility to ensure
that the quick connect refrigerant couplings are properly mated and
are leak free. It is also their responsibility upon start-up to check the
system for proper operation and make any necessary temperature
control or thermal expansion valve adjustments.
Note: A drain line is required to be run by the contractor for this type
of installation.
All systems require a
permanent connection
to an electrical service
and a connection at the
junction box located
within the condensing
unit housing. Refer to
the serial tag for all
pertinent
electrical
data. These systems
must be connected
to a power supply
disconnect
switch
and wired according
to local and national
Connecting to the Evaporator Section Side
electric codes.
© 2008 Nor-Lake 4/08 PN 121430
11